A gold mine consisting of the following is for sale: 2x 1450 Stamp mills currently running, a running 50 Tonne per day CIP plant (complete with 10 steel tanks, 2x blowers, 2x slurry pump, 1x 2 Tonne per hour ball mill from ABJ Engineering, 2x conveyors, 2x ore bins, well designed fenced off tailings dam,), 8x 50 Tonne Vat leach tanks, 1x clarifier, 1x carbon room, 1x return tank, 10x Blair toilets, 2 x bath rooms, 10 modern cottages made from pressed concrete blocks, ix office, 1x customers shade 1x 90m deep borehole with plenty of water, 1x 200KVA transformer, a cluster of 8 gold mine blocks adjacent to each other, with a semi developed vertical shafts, well fenced work site, with plenty of customers for custom Milling, with an average of about 1kg gold output per month from Vat leach tanks and CIP plant with a huge potential to produce more gold output per month. [number removed] tonne post Vat leach dump with an average of 1. 1g of gold per Tonne worth about 20kgs of gold worth about US$1. 2 million.